Key takeaways
  • Start with a written transport requirements document from engineering: shock, climate, cleanliness and handling limits.
  • Choose the mode based on the container, the destination and the requirements, not on habit.
  • Export control and dangerous goods questions take longer than the transport itself, so start them first.
  • Plan the last mile at the launch site as carefully as the main carriage.
  • Agree in advance how logger data is read out and who decides if a limit was exceeded.

1. Define the transport requirements

Everything starts with a clear statement from the engineering team of what the satellite may and may not experience. This transport requirements document usually covers maximum quasi-static and shock loads, temperature and humidity ranges, cleanliness class inside the container, purge requirements, orientation and lifting points.

Without this document, every later decision is a guess. With it, carriers, aircraft and vehicles can be checked objectively, and the whole team knows what success looks like.

2. Confirm the container and handling equipment

Most satellites travel in a dedicated transport container that provides mechanical protection, a controlled atmosphere and sometimes active climate control. Small satellites and CubeSats may use custom transport cases.

Confirm early which container is used, its external dimensions and weight, its lifting and tie-down points, and any power or gas supply it needs during transport. These figures decide which aircraft, trucks and loading equipment are possible, and which airports and roads can be used.

3. Choose the transport mode

There is no standard answer. The right mode depends on the container, the distance, the requirements and the infrastructure at both ends.

  • Air charter Common for large spacecraft containers and intercontinental moves. Allows direct routing and controlled loading, but needs suitable airports at both ends.
  • Scheduled freighters Possible for smaller spacecraft and cases that fit standard main-deck positions and handling.
  • Road transport Air-ride suspension trucks with climate control for European and regional moves, often with escort and planned routes.
  • Combined Road to and from the airports, air for the main leg. Every additional handover adds risk and needs a plan.

4. Start export control and dangerous goods early

These two topics have the longest lead times. A spacecraft or its components may require an export licence, and the documents must reference it correctly. The import country may have its own requirements. Our guide on export control for satellite components explains the main regimes.

At the same time, check what on board is a dangerous good: batteries, pressurised tanks, pyrotechnic devices, residual propellants. A satellite shipped with installed batteries or pressurised systems is a dangerous goods shipment, and some combinations need special approvals. See our article on shipping COPVs and pressure vessels.

5. Plan monitoring and evidence

Agree with the quality team which loggers are used, where they are mounted, which thresholds apply and when the data is read out. Define who decides if a threshold was exceeded and what happens next.

The goal is simple: when the container is opened at the launch site, everybody knows that the satellite stayed inside its limits, or knows exactly what happened and where.

6. Prepare the launch site arrival

The last mile is often underestimated. Launch sites have arrival windows, access procedures, customs formalities and their own handling rules. Some are reached through ports or airports with limited equipment.

Confirm the arrival date with the launch provider, brief the local customs and handling partners, check the route from the airport or port to the site and plan where the container is opened. Our launch campaign logistics checklist lists the details to confirm.

7. Execute with one accountable lead

On the day of the move, the plan meets reality. Weather, aircraft availability or a missing permit can force changes. What protects the satellite is a single person who knows the plan, the requirements and every party involved, and who has the authority to stop, adapt or escalate.

After delivery, hand over the documents, the logger data and a short report. It is the basis for the next shipment and for your programme records.